Beaufort Park

Project Introduction

Our task was to construct a basement and RC frames over a total area of 3050m2 which rose in height to the full 10 storeys.

 

In the wettest winter period on record, our challenge in constructing this multiple block concrete structure of up to 10 storeys was to provide a waterproof floor slab at the lowest point of a large sloping development.

 

We took a big picture approach to problem solving and introduced a range of innovative measures to ensure the project was delivered on time and to the highest standard. These included the introduction of Bamtec roll mats in place of loose bars as slab reinforcement and the use of precast columns to ensure just in time delivery.

Client:

Galldris Value: £5m

Duration: 27 weeks

Innovation

  • Introduction of Bamtec roll mats in place of loose bars as slab reinforcement
  • The use of precast columns
  • 4No. Concrete Frames
  • Provided a waterproof floor slab
  • Just in time delivery basis

Project photos

On behalf of Wilmott Dixon, working for St George we delivered a multiple block concrete structure incorporating residential units up to 10 stories in height, a podium slab with covered split-level car park, commercial dwellings to street side and roads, sewers and services for the infrastructure.

 

We developed and delivered the waterproofing system for the ground floor and lift cores. The road network to the perimeter of site was completed by balancing the cut and fill to suit the program of works. A wealth of new amenities for residents and the local community alike